Almaty – Metropole 1

The project explored the feasibility of using a seismic isolation system for foundations. Calculations were made to evaluate the effectiveness of the isolators, aimed at reducing the impact of seismic loads on the building.

Structural design optimization was also conducted, including strengthening individual components and connections, as well as selecting modern seismic-resistant materials. Based on these results, recommendations were developed for operating the facility under seismic conditions, including maintenance procedures and additional structural monitoring measures.

Other projects

проектирование устойчивых зданий к землетрясениям

Sebes Turda Highway

Comprehensive work was carried out on the Sebes-Turda highway to implement seismic isolation systems for bridge structures.

сейсмоизоляция фундаментов

Astana – Independence Monument

In the Astana – Independence Monument project, special attention was paid to the seismic resistance of the structure.

инновационные технологии сейсмозащиты CIS Expert

Almaty – Metropole 2

As part of the Almaty – Metropol 2 project, detailed FEM models were developed and used to analyze the building’s seismic resistance.

Сейсмическое обследование площадки строительства

Almaty – Metropole 1

As part of the Almaty – Metropol 1 project, comprehensive work was carried out on seismic-resistant design of buildings.

Avenue 32 project in Shymkent

The Avenue 32 project in Shymkent is being implemented using MAURER SIP-D technology—a solution used in seismically active regions of Europe and Asia.